Browning Court - Bolton, Ontario

Description

Tilt-up panels were used as an exterior finish to this pre-engineered steel building. The owner required an insulated hard wall system and rather than go with the traditional masonry route insulated tilt-up walls with an exposed aggregate finish were used.

Project Details

Project: 9 Browning Court
Location: Bolton, Ontario
Year built: 2005
General Contractor: Dig-Con International Limited
Building use: industrial spec
Square footage of insulated panels: 17,404 sq ft
Square footage of non-insulated panels: 1,840 sq ft
Number of panels: 41
Exterior finish: exposed aggregate
Interesting Facts: Panels were used to clad a pre-engineered steel building