Project Details

Building Use: Relay Buildings
Year Build: 2016
Engineer of Record: Barry Bryan and Associates
General Contractor: JJ McGuire General Contractors
Square Footage of Panels: 20,338 sq ft
Number of Panels: 66
Heaviest Panel: 46,153 lbs
Tallest Panel: 19’-7”
Largest Panel: 351 sq ft

Description

In order to expedite the construction of the Relay Buildings A and B, while providing an economical alternative to a precast building, BBA recommmenced and organized a change of construction methodology to tilt-up concrete construction. The alternate method of construction was able to provide multiple benefits to the owner and the design-build team.