Grace Christian School - Tilt-Up Construction Dundas Ontario

Grace Christian School – Dundas, Ontario – 2017

Tilt-up was chosen, because as a private school funded by donations every dollar counts! Tilt-up offers a savings of +/- 15% over traditional construction methods.

VIEW PROJECT

Broadview Public School - Ottawa, Ontario - 2016

Broadview Public School – Ottawa, Ontario – 2016

Broadview Public School was a complex job with an aggressive construction timeline.  Most of the tilt-up panels were built during the winter months.

VIEW PROJECT

Holland Marsh Christian School - Gwillimbury, Ontario - 2014

Holland Marsh Christian School – Gwillimbury, Ontario – 2014

After several revisions to drawings and exploring many different building options, site cast tilt-up concrete was chosen as the construction method for their new facility.

VIEW PROJECT

Cite Jeunesse Addition CFB - Trenton, Ontario - 2014

Cite Jeunesse Addition CFB – Trenton, Ontario – 2014

This project involved an addition to an existing tilt-up school.  This addition comprised a daycare which required lots of natural light.

VIEW PROJECT

Russel Reid Public School - Brantford, Ontario - 2012

Russel Reid Public School – Brantford, Ontario – 2012

This 3 classroom addition was originally designed as a precast building.  Using tilt-up versus precast achieved a significant savings on this project.

VIEW PROJECT

Rose Des Vents - Cornwall, Ontario - 2010

Rose Des Vents – Cornwall, Ontario – 2010

Rose de Vents was designed using tilt up construction knowing that there would be an aggressive construction schedule.

VIEW PROJECT

Humber College Building B - Toronto - 2007

Humber College Building B – Toronto – 2007

When Humber College decided to build their new North Campus Academic and Student Service Building, tilt-up construction was chosen as the building method.

VIEW PROJECT