Toronto District Christian High School – Woodbridge, Ontario – 2019
This project showed the architectural versatility of tilt-up. A unique reveal pattern was achieved by placing individual reveal strips into the panels.

Grace Christian School – Dundas, Ontario – 2017
Tilt-up was chosen, because as a private school funded by donations every dollar counts! Tilt-up offers a savings of +/- 15% over traditional construction methods.

University of Guelph Addition – Guelph, Ontario – 2017
Bio-products Discovery and Development Center used tilt-up construction for the University of Guelph research center, using an integral colored concrete finish.

Broadview Public School – Ottawa, Ontario – 2016
Broadview Public School was a complex job with an aggressive construction timeline. Most of the tilt-up panels were built during the winter months.

Holland Marsh Christian School – Gwillimbury, Ontario – 2014
After several revisions to drawings and exploring many different building options, site cast tilt-up concrete was chosen as the construction method for their new facility.

Cite Jeunesse Addition CFB – Trenton, Ontario – 2014
This project involved an addition to an existing tilt-up school. This addition comprised a daycare which required lots of natural light.

Russel Reid Public School – Brantford, Ontario – 2012
This 3 classroom addition was originally designed as a precast building. Using tilt-up versus precast achieved a significant savings on this project.

Rose Des Vents – Cornwall, Ontario – 2010
Rose de Vents was designed using tilt up construction knowing that there would be an aggressive construction schedule.

Humber College Building B – Toronto – 2007
When Humber College decided to build their new North Campus Academic and Student Service Building, tilt-up construction was chosen as the building method.