Tilt-Up Construction Resources

Search Knowledge Base by Keyword

How are Tilt-Up Panels Lifted into Place?

< Back

How are Tilt-Up concrete panels lifted in place - Tilt Wall Ontario IncOnce the Tilt-Up panels have being casted, they are then tilted or lifted into their final destination. The crane operator will lift these in place, while the Tilt-Up crew will secure these into the foundation with braces. The braces are connected to the slab, the cables from the crane are disconnected, and the process is repeated with the remaining panels.

Send this to a friend