Tilt-Up Construction Resources

Search Knowledge Base by Keyword

How Long Does Construction of a Tilt-Up Building Take?

< Back

How long does construction of a Tilt-Up building take - Tilt Wall Ontario IncThis really depends on the size of the building, the location and the like. However, on an average size building, a tilt-up building can be erected and roofed within 2 to 6 months.

Once you have chosen to work with Tilt-Up construction, we can have a better timeline during the pre-construction phase after learning what needs to be done to the site, the size of the building and the like.

Send this to a friend