Search Knowledge Base by Keyword

How Long Does Construction of a Tilt-Up Building Take?

< Back

How long does construction of a Tilt-Up building take - Tilt Wall Ontario IncThis really depends on the size of the building, the location and the like. However, on an average size building, a tilt-up building can be erected and roofed within 2 to 6 months.

Once you have chosen to work with Tilt-Up construction, we can have a better timeline during the pre-construction phase after learning what needs to be done to the site, the size of the building and the like.

Subscribe to Newsletter

Receive monthly insides on the latest trends in the construction industry, interesting construction facts, and stay on top of our latest projects by subscribing to our monthly newsletter.

We never share this data with 3rd part companies.

Thank you!

Send this to a friend