Tilt-Up Construction Resources

Search Knowledge Base by Keyword

How Much Casting Space is Needed?

< Back

How much casting space is needed - Tilt Wall Ontario IncWhen constructing a building using Tilt-Up construction, it is imperative that there be enough space to do so. Walls are constructed on site, and a crane is brought in to help put them into place. This is why space is a must!

We estimate that you need to have at least 20% of space around the floor slab, depending on the size of the building. In addition, have a flat terrain is a must have so that the crane can operate as it should.

With each tilt-up project, Tilt Wall will check the space surrounding where the actual building will be placed to ensure that it is conductive for Tilt-Up construction.

Send this to a friend